Construction scope for on-site and backup generation

Site, foundations, buildings, utilities, electrical balance of plant and system readiness — within a clearly agreed responsibility matrix.

01 / TECHNICAL SCOPE

Define the scope before making promises

This is a typical solution architecture, not a completed-project claim. The actual role, equipment, voltage and metrics are fixed in a project-specific proposal.

01

Site survey and input data

Boundary and inputs are confirmed per project.

02

Site preparation and civil works

Boundary and inputs are confirmed per project.

03

Foundations for gensets and auxiliary equipment

Boundary and inputs are confirmed per project.

04

Cable and balance-of-plant infrastructure

Boundary and inputs are confirmed per project.

05

Testing coordination and as-built documentation

Boundary and inputs are confirmed per project.

02 / DELIVERABLES

Every outcome needs an audit trail

  1. 01Interface matrix
  2. 02Schedule baseline
  3. 03Procurement plan
  4. 04Quality plan
  5. 05Handover dossier
03 / CONTROLLED OUTPUTS

What is controlled on every project

CONTROL POINTINPUTS / INTERFACES
CONTROL POINTSCHEDULE BASELINE
CONTROL POINTSYSTEM HANDOVER
04 / PROJECT QUESTIONS

Before the first engineering discussion

What is required for an initial assessment?

Asset type, location, current stage, capacity, target date and required MONOLIT boundary. Available scope, BOQ, single-line diagram and drawings reduce the number of assumptions.

Can the work be awarded as a separate package?

Yes. Engineering, Procurement, Construction and Commissioning can be considered separately or as a connected EPC scope. The actual boundary is fixed in the responsibility matrix and contract.

How are equipment and supply controlled?

Through technical requirements, vendor data, expediting, FAT, logistics, incoming inspection and document control aligned with the required-on-site date.

When can schedule and cost be stated?

After initial qualification of inputs, site, interfaces and risks. Any early estimate includes explicit assumptions and is not a commercial offer.