HEAT / SOLUTION

Boiler plants, mechanical systems and site utilities

Coordination of civil, mechanical and electrical scopes from initial loads through testing and operating readiness.

01 / TECHNICAL SCOPE

Define the scope before making promises

This is a typical solution architecture, not a completed-project claim. The actual role, equipment, voltage and metrics are fixed in a project-specific proposal.

01

Loads and input data

Boundary and inputs are confirmed per project.

02

Civil works and foundations

Boundary and inputs are confirmed per project.

03

Mechanical installation

Boundary and inputs are confirmed per project.

04

Heat substations, pumping and utilities

Boundary and inputs are confirmed per project.

05

Hydraulic testing and handover

Boundary and inputs are confirmed per project.

02 / DELIVERABLES

Every outcome needs an audit trail

  1. 01Load balance
  2. 02Procurement schedule
  3. 03Test plan
  4. 04Inspection records
  5. 05Operating dossier
03 / PROJECT DATA

Data required for the next verified case

DATA REQUIREDThermal load: DATA REQUIRED
DATA REQUIREDFuel: DATA REQUIRED
DATA REQUIREDConfiguration: DATA REQUIRED