GEPP / SOLUTION
Civil and electrical balance of plant for gas-engine gensets: site, foundations, building, auxiliaries, utilities, power evacuation and commissioning within an agreed boundary.
This is a typical solution architecture, not a completed-project claim. The actual role, equipment, voltage and metrics are fixed in a project-specific proposal.
Boundary and inputs are confirmed per project.
Boundary and inputs are confirmed per project.
Boundary and inputs are confirmed per project.
Boundary and inputs are confirmed per project.
Boundary and inputs are confirmed per project.
Asset type, location, current stage, capacity, target date and required MONOLIT boundary. Available scope, BOQ, single-line diagram and drawings reduce the number of assumptions.
Yes. Engineering, Procurement, Construction and Commissioning can be considered separately or as a connected EPC scope. The actual boundary is fixed in the responsibility matrix and contract.
Through technical requirements, vendor data, expediting, FAT, logistics, incoming inspection and document control aligned with the required-on-site date.
After initial qualification of inputs, site, interfaces and risks. Any early estimate includes explicit assumptions and is not a commercial offer.