DCP / SOLUTION

Power infrastructure for data centres and critical loads

Redundancy, gensets, substations, distribution, long-lead procurement, phased testing and documented system readiness.

01 / TECHNICAL SCOPE

Define the scope before making promises

This is a typical solution architecture, not a completed-project claim. The actual role, equipment, voltage and metrics are fixed in a project-specific proposal.

01

N/N+1/2N and phasing

Boundary and inputs are confirmed per project.

02

Substations and distribution

Boundary and inputs are confirmed per project.

03

Gensets and fuel systems

Boundary and inputs are confirmed per project.

04

Critical procurement

Boundary and inputs are confirmed per project.

05

IST and phased handover

Boundary and inputs are confirmed per project.

02 / DELIVERABLES

Every outcome needs an audit trail

  1. 01Responsibility matrix
  2. 02Technical scope
  3. 03Schedule baseline
  4. 04Quality and test plan
  5. 05Handover dossier
03 / PROJECT DATA

Data required for the next verified case

DATA REQUIREDCapacity: DATA REQUIRED
DATA REQUIREDLocation: DATA REQUIRED
DATA REQUIREDActual role: DATA REQUIRED