CRIT / SOLUTION

Infrastructure where loss of power is unacceptable

Redundancy, power distribution, construction readiness, long-lead procurement and a staged integrated testing programme.

01 / TECHNICAL SCOPE

Define the scope before making promises

This is a typical solution architecture, not a completed-project claim. The actual role, equipment, voltage and metrics are fixed in a project-specific proposal.

01

Reliability category and phasing

Boundary and inputs are confirmed per project.

02

Backup gensets and auxiliaries

Boundary and inputs are confirmed per project.

03

Substations, switchgear and distribution

Boundary and inputs are confirmed per project.

04

Fuel and cable infrastructure

Boundary and inputs are confirmed per project.

05

Integrated testing and handover

Boundary and inputs are confirmed per project.

02 / DELIVERABLES

Every outcome needs an audit trail

  1. 01Redundancy matrix
  2. 02Interface register
  3. 03ITP / test plan
  4. 04Punch-list register
  5. 05Phased handover dossier
03 / CONTROLLED OUTPUTS

What is controlled on every project

CONTROL POINTREDUNDANCY MATRIX
CONTROL POINTSTAGED TESTING
CONTROL POINTPHASED HANDOVER
04 / PROJECT QUESTIONS

Before the first engineering discussion

What is required for an initial assessment?

Asset type, location, current stage, capacity, target date and required MONOLIT boundary. Available scope, BOQ, single-line diagram and drawings reduce the number of assumptions.

Can the work be awarded as a separate package?

Yes. Engineering, Procurement, Construction and Commissioning can be considered separately or as a connected EPC scope. The actual boundary is fixed in the responsibility matrix and contract.

How are equipment and supply controlled?

Through technical requirements, vendor data, expediting, FAT, logistics, incoming inspection and document control aligned with the required-on-site date.

When can schedule and cost be stated?

After initial qualification of inputs, site, interfaces and risks. Any early estimate includes explicit assumptions and is not a commercial offer.